Cllr Weatherill reported on the flood group and drains. Cllr Weatherill had talked about the problem of flooding with a BANES senior engineer /showed him the locations of the flooding issues. This resulted in him agreeing to:-
Put the flooding on the dip in the road towards Bishop Sutton on the highest priority level for clearing / action in the case of flooding.
Use camera’s in the most problematic flooding sites to see if there are blockages and clear as appropriate.
Investigate ways to alleviate flooding problems in both the short, medium and long term. One issue that had been noted was a change in the camber of Ridge Lane in several places after resurfacing which has resulted in water passing several large drains. (Has to be a long term fix). Short to medium fixes could include the introduction of kerb stones / larger drains in several locations in order to alleviate the issue of lifting drain covers and flooding in/around village.